Project 2245

700 Foster Drive

Des Moines, Iowa

  • Building Function
    Single-Family
  • Project Type
    New Construction
  • ASHRAE Climate Zone
    5A - Cool - Humid
  • Status
    Design Certified
  • INT. Conditioned Floor Area
    6643 sq. ft.

Core Project Team

  • Phius Certified Rater
    John David Holtzclaw
  • Phius CPHC (Secondary)
    Eric Neuhaus
  • Phius CPHC (Lead)
    Ilka Cassidy
  • Project Submitter
    Ilka Cassidy
Project Information
Project Information
Performance
Performance
Enclosure
Enclosure
Systems & Equipment
Systems & Equipment