Certified Projects Database
No. |
1659 |
Project |
ABC No Rio |
Status |
Pre-certified |
Lead CPHC |
Jordan Goldman
|
Builder |
|
Location |
New York, NY |
QA/QC Rater |
Jordan Dentz |
Architecture Planning |
Paul Castrucci Architect |
Mechanical Systems Designer |
ZeroEnergy Design |
Constr. Type |
Masonry |
Bldg. Function |
Commercial |
Floor Area |
7696 |
Project Type |
New Construction |
HERS Index |
|
LEED Rating |
|
Energy Star Rating |
|
Heating Degree Days |
4313 |
Cooling Degree Days |
|
Units |
1 |
Certification Type |
PHIUS+2015
|
Certification Date |
|
Exterior Wall |
8" CMU + 4" polyiso w/ rainscreen (U-0.033) |
Floor |
6" concrete slab + 4" XPS (U-0.048) |
Roof |
6" concrete slab + 6" polyiso (U-0.027) |
Window Frame |
Alpen Tyrol TR9, uPVC; Uf = 0.15 |
Window Glazing |
Ug = 0.077; SHGC = 0.453 |
Entrance Door |
R-4 |
Ventilation |
Half of the ventilation is provided by a packaged rooftop unit. Sensible efficiency = 65%; latent efficiency = 65%. The other half is provided by a Ventacity 1000 RTe ERV. Sensible efficiency = 77%; latent efficiency = 65% |
Heating System |
Half of the heating is provided by the RTU, which is an 80% gas-fired heater. The other half is provided by an ASHP, annual COP = 2.75 |
Submitter |
Jordan Goldman |
Air-tightness |
0.05 CFM/sf |
Cooling System |
Half of the cooling is provided by the RTU, has a cooling COP of 3.84. The other half is provided by an ASHP, which has a cooling COP of 6.5 |
Additional Consultants |
|
Additional Notes |
|