Help Make Passive Building Mainstream Support PHIUS
Certified Projects Database
No. 1379 Project Spring House Status Certified
Lead CPHC Chris West
Sarah Cobb
Builder William Murray and Sarah Cobb Location Abercorn, QC
QA/QC Rater Ross Elliott Architecture Planning Mechanical Systems Designer
Constr. Type Mixed timber-masonry Bldg. Function Single Family Floor Area 1432
Project Type New Construction HERS Index LEED Rating
Energy Star Rating Heating Degree Days 7898 Cooling Degree Days 505
Units 1 Certification Type PHIUS+2015 Certification Date March 2, 2018
Exterior Wall 17" double stud wall with 1.5" service cavity inside and 1.5" of Eco4 insulation board (like Gutex)
Floor Slab: 9" EPS with 3" rat slab on top
Roof 30" cellulose, vented sloped roof (scissor or parallel truss)
Window Frame Klearwall Future Proof windows (Uframe=0.12 Btu/sq ft*hr*F)
Window Glazing Ug=0.088
Entrance Door Klearwall doors
Ventilation Zehnder ERV
Heating System Mitsubishi ASHP
Submitter Chris West
Air-tightness 0.005 CFM50/ft2, 0.10 ACH50
Cooling System
Additional Consultants
Additional Notes

Subscribe to our Newsletters

YouTube Follow us on Twitter We're on Facebook PHIUS Blog

© 2018 Passive House Alliance. All Rights Reserved. HOME | PRIVACY | BLOG | CONTACT US

Atlanta Web Design