Certified Projects Database
No. |
1218 |
Project |
344 Rachel Carson Trail |
Status |
Certified |
Lead CPHC |
Lois B. Arena
|
Builder |
Michael Carpenter |
Location |
Ithaca, NY |
QA/QC Rater |
Karla Donnelly |
Architecture Planning |
Coterre Planning Development Design |
Mechanical Systems Designer |
|
Constr. Type |
Timber |
Bldg. Function |
Single Family |
Floor Area |
1267 |
Project Type |
New Construction |
HERS Index |
39 |
LEED Rating |
|
Energy Star Rating |
|
Heating Degree Days |
6273 |
Cooling Degree Days |
|
Units |
1 |
Certification Type |
PHIUS+
|
Certification Date |
June 17, 2014 |
Exterior Wall |
double stud, ccSPF + cellulose, R53 |
Floor |
slab on grade, R19 edge, R35 under |
Roof |
vented attic, R-90 cellulose |
Window Frame |
CPVC, Uf-0.17 |
Window Glazing |
triple pane, Ug-0.106 |
Entrance Door |
foam filled fiberglass, R-7 |
Ventilation |
ERV, 83% |
Heating System |
electric resistance |
Submitter |
Lois B. Arena |
Air-tightness |
0.52 @ ACH50 |
Cooling System |
none |
Additional Consultants |
|
Additional Notes |
|