Certified Projects Database
No. |
1153 |
Project |
Summit Haus |
Status |
Pre-certified |
Lead CPHC |
David Brach
|
Builder |
Park City Design Build |
Location |
Park City, UT |
QA/QC Rater |
|
Architecture Planning |
Park City Design Build |
Mechanical Systems Designer |
Park City Design Build |
Constr. Type |
Timber |
Bldg. Function |
Single Family |
Floor Area |
1869 |
Project Type |
New Construction |
HERS Index |
|
LEED Rating |
|
Energy Star Rating |
|
Heating Degree Days |
2485 |
Cooling Degree Days |
|
Units |
1 |
Certification Type |
PHIUS+
|
Certification Date |
|
Exterior Wall |
2x4 + 12" Larson Truss. |
Floor |
Slab over EPS |
Roof |
14" TJI + EPS |
Window Frame |
Zola Thermo uPVC |
Window Glazing |
Zola Thermo uPVC |
Entrance Door |
|
Ventilation |
|
Heating System |
Navien NPE-180A |
Submitter |
Chris Price |
Air-tightness |
|
Cooling System |
na |
Additional Consultants |
Dave Brach, PHC |
Additional Notes |
|