Help Make Passive Building Mainstream Support PHIUS
Certified Projects Database
up down
No. 1146 Project Global Sustainable Solutions Status Certified
Lead CPHC Natalie Leonard
Builder Global Sustainable Solutions Location Waubaushene, ON, ON
QA/QC Rater John Harris Architecture Planning Mechanical Systems Designer
Constr. Type Insulated concrete forms Bldg. Function Single Family Floor Area 2725
Project Type New Construction HERS Index LEED Rating
Energy Star Rating Heating Degree Days 7666 Cooling Degree Days
Units 1 Certification Type PHIUS+    
Exterior Wall Stucco, 4" EFS, ICF, 2 x4 service wall with blown in fiberglass, drywall
Floor Finished 4" concrete slab, 7.5 EPS insulation
Roof Raised heel trusses, 27" blown in cellulose, 3" 1/2lb spray foam, osb, 2 x 3 strapping, drywall
Window Frame Accurate Dorwin fiberglass casements and fixed units
Window Glazing AFG Comfort E2 and Triac 40
Entrance Door Thermatru doors, Inline fiberglass patio doors
Ventilation Life Breath 195
Heating System Fujitsu 9RLS ductless mini-split and electric baseboards
Submitter Natalie Leonard
Air-tightness 0.37 ACH
Cooling System Ductless Mini-split
Construction Year
Additional Consultants Passive House E-Design
Additional Notes